February 28, 2026

Bridging the Gap: Real-World Coordination Challenges for Structural Engineers

Structural engineering isn’t just about calculations—it’s about making assumptions explicit, validating them against the built environment, and translating loads into actionable design decisions. Even perfect analysis won’t prevent problems if coordination fails. Here are four real-world cases that illustrate the challenges and solutions that practicing engineers face daily. Architect Coordination – “The Wall Section That Didn’t Exist” Project: Multi-story mixed-use building Challenge: The architectural drawings specified a wall section that was shallower than required for structural framing. Technical Issue: The structural model indicated that full lateral loads required a thicker wall cavity to properly anchor the framing. If built per the architectural drawings, the wall would have created clearance issues and compromised the lateral load path. Solution & Workflow: Compared architectural sections to the structural model in 3D. Highlighted discrepancies in the model and prepared annotated visuals. Shared a clear summary with the architect outlining why the wall depth needed adjustment. Outcome: The architect revised the wall section prior to construction. No field conflicts occurred, and the project stayed on schedule. Engineering Lesson: Always validate architectural assumptions against your structural model. Small dimensional mismatches can create drift, clearance, or lateral capacity problems. Contractor Coordination – “The Footing That Wasn’t There”…

Read More

January 17, 2019

RISAFloor & RISA-3D: Two Buildings on the Same Podium

RISAFloor is the RISA Building System’s floor design software which allows...

Read More
January 03, 2019

What wood wall design method should I use?

RISA-3D is one of the few pieces of software on the market offering wood...

Read More
November 16, 2018

HSS Tube Moment Connections per CSA S16 now Available

Wide Flange beam to HSS Tube column moment connections can now be designed...

Read More
November 16, 2018

Using & Disabling the Base Material Proration Factor

The base material at the location of a weld may have less strength than...

Read More
November 16, 2018

Tapered Gusset Plates using Custom Angle

Modeling tapered gusset plates in RISAConnection is now easier than ever....

Read More
November 16, 2018

Include Transfer Forces in Vertical Brace Connections

RISAConnection assumes by default that your vertical brace connection is a...

Read More
November 15, 2018

HSS Tube Moment Connections per AISC 360 now Available

Wide Flange Beam to HSS Tube Column Moment Connections can now be designed...

Read More
November 02, 2018

Masonry Lintel Analysis using FEA

In RISA-3D, the current method of design for masonry lintels is Simply...

Read More
October 26, 2018

What’s New in the NBC 2015?

The 2015 NBC compliant codes have been implemented into RISA-3D v17.0,...

Read More

Subscribe to Our Newsletter

Our monthly "Structural Moment" newsletter is the best way to keep up with RISA’s product updates, new releases, new features, training events, webinars and more...