cd factor for wood hold-downs

CD Factor for Wood Hold-Downs

If you have utilized Hold-Down's in RISA-3D, you have mostly likely noticed that a value of CD is reported for each selection in the database. However, it may not be clear how it is being used?

2020 09 02 16h52 11

The CD factor that is reported here actually represents the CD factor that is already built into the allowable tension values that are presented in the Hold-Down schedules. Simpson states the following in their “Holdown and Tension Tie General Notes” section:

2020 09 02 17h04 44

Therefore the allowable tension values that are shown in the database tables have already been modified by the CD factor shown. This also allows the Hold-Down schedule in RISA-3D to be easily comparable to the tabulated values in the Simpson load tables since they also have this factor built in.

2020 09 02 17h16 57 2020 09 02 17h18 28

The obvious question then becomes “what happens if for your specific load combination you have a CD factor other than what is built into this Allowable Tension value”?

RISA-3D actually handles this situation in a very straightforward manner. In the load combination spreadsheet, within the Design tab, you can specify the appropriate CD factor for that load combination.

2020 09 02 17h32 42

RISA-3D will then adjust the Hold-Down capacity by taking a ratio of the CD factor that you input in the load combination and the CD factor that is noted in the schedule. The following example will help further demonstrate how the program handles this.

Here we have two load combinations with different CD factors.

2020 09 02 18h03 58

For the same wall panel, the program will adjust the capacity of the wall Hold-Downs according to the CD factor that is specified in the load combinations. When solving load combination 1 with a specified CD factor of 0.9 shown above, you will see this CD factor displayed in the detail report along with the corresponding adjusted capacity. For reference, the program will always display the base capacity of the Hold-Down which is when CD=1.

2020 09 08 12h04 16

When solving load combination 2 with a specified CD factor of 1.6, you will see this capacity adjusted accordingly for the same selected Hold-Down.

2020 09 08 13h29 06